Tarmac driveway contractors
A new driveway, dug out and built properly — with the sub-base, edgings and drainage written into the quote rather than discovered later.
In short
A new tarmac driveway is normally excavated to around 250mm, laid with a compacted MOT Type 1 sub-base, then a binder course and a surface course, with edgings to hold it in place. Expect one to two days on site for a typical driveway, and 24 to 48 hours before parking on it.
On this page
How we lay a driveway · Drainage and planning permission · What it costs · Looking after it
Tarmac remains the most practical driveway surface for most homes: it takes vehicles quickly, handles the UK's weather, costs less than block paving or resin, and can be repaired in patches instead of lifted wholesale.
What separates a driveway that still looks right in fifteen years from one that cracks in three is entirely below the surface — how deep it was dug, what went in, how well it was compacted, and where the rainwater goes.
How we lay a driveway
- Survey. We measure up, check access, look at where water currently runs and agree the finished levels — particularly against your doorway and any airbricks.
- Excavation. Typically 200–250mm of dig-out, more on soft ground. The spoil is carted away.
- Edgings. Kerbs or block edgings set on concrete, so the tarmac has something to be compacted against and cannot spread.
- Sub-base. MOT Type 1 laid in layers and compacted with a roller, not a plate.
- Binder course. Around 40–50mm, laid and rolled.
- Surface course. Around 20–30mm of 6mm or 10mm macadam, rolled to a tight finish.
- Clear up. Site cleaned, and you are told when the drive can take the car.
Drainage and planning permission
Since 2008, a new or replacement driveway over five square metres in England that drains directly onto the public road needs planning permission. You avoid that by using a permeable surface, or by directing run-off to a soakaway, border or lawn on your own land — which is what we normally do.
A dropped kerb, if you need one, is a separate application to your local authority and is not something a surfacing contractor can grant. We can tell you whether you need one; you apply, or we can point you at the process.
What it costs
A fully installed tarmac driveway generally falls between £35 and £85 per square metre, with a good deal of variation by region and by what the price includes. That range is wide for a reason:
- A resurface over a sound existing base sits near the bottom of it
- A full dig-out, new sub-base, edgings and drainage sits near the top
- Small driveways cost more per square metre, because the plant and delivery cost the same for 20m² as for 60m²
- Access, ground conditions and disposal of spoil all shift the figure
We quote a fixed price after a site visit, with the build-up written down.
Looking after it
- Keep the edges clear of soil and growth so water can get away
- Avoid turning the steering wheel while stationary, especially in hot weather
- Keep point loads — skip feet, trailer legs, motorbike stands — off it, or spread the load with a board
- Deal with small cracks early, before water gets underneath and frost opens them up
- Petrol and oil spills soften bitumen; rinse them off rather than leaving them
How projects run
The same five stages on every job, scaled to the site.
Site survey
We measure the area, assess the existing surface and ground conditions, and check access for plant and deliveries.
Specification and quote
A written quote setting out the build-up, depths, materials, drainage, edgings and what is excluded.
Preparation
Planing or excavation, removal of arisings, sub-base laying and compaction, plus any drainage and kerbing.
Laying
Binder and surface courses laid and rolled to the specified depth, with joints and levels set out against falls.
Handover
Line marking where required, site cleared, and written guidance on when the surface can take traffic.
Questions we get asked
Anything not covered here, call 0208 050 7207.
Fifteen to twenty years is normal for a properly constructed driveway, and longer where drainage is good and small defects are repaired as they appear.
Usually 24 to 48 hours for vehicles, sooner for foot traffic, depending on depth and weather. We will give you the figure before we leave.
Not usually. Permission is only needed where a new or replacement driveway over five square metres drains directly onto the public road. Directing water to a soakaway or a border on your own land avoids it.
Sometimes. If the existing surface is sound and levels allow, an overlay is cheaper and quicker. If it is cracked because the base has gone, overlaying it just moves the problem up 30mm.
Yes, usually by a wide margin — typically around half the cost per square metre. Block paving allows individual units to be lifted and reset; tarmac gives you a continuous surface and a much faster installation.
Red is the most common. The colour comes from the aggregate in the mix rather than a coating, so it wears rather than peeling, and it usually adds 10–20% to the surface cost.
Related services
Get a price for your tarmac driveways
Send the site postcode, rough area and what's there now. A photo helps more than anything else.