Industrial surfacing
Yards, hardstandings and circulation areas built for repeated heavy loading, phased around live operations.
Industrial surfacing
Part of most surfacing schemes we carry out, and available as standalone work.
Industrial surfaces fail in a particular way: not evenly, but in the places where loaded vehicles turn, brake and stand. A yard built to car park depths will rut within a year of taking articulated deliveries.
What changes on an industrial site
- Deeper build-ups and a stiffer sub-base, designed around axle loads rather than area
- Rut-resistant wearing courses such as SMA in turning and loading areas
- Concrete or heavy-duty construction at dock levellers, container standing and skip points
- Drainage sized for large impermeable areas, often with interceptors
- Phasing that keeps the yard operational, frequently overnight or at weekends
Working around a live operation
We plan industrial jobs backwards from your delivery schedule: which bays can be closed, for how long, and what the vehicle routing looks like while they are. On sites running shifts, that usually means working in tighter windows and more phases than a commercial car park would need.
[Add Cooper Jackson's industrial project evidence here — area, loading, phasing]
Related services
Request a free quote
Send us the site details and we'll come back with next steps. For anything urgent, call us.